Sundby Church
Refurbishment and design of furniture
Sundby Church
The church is being refurbished with new floors and a staircase up to the high altar – and new furniture is added, i.e. pews, baptismal font and pulpit.
The conversion is now well on the way and is expected to be completed by the end of 2021. The floor from 1960 has been removed, and a new, solid oak floor with underfloor heating is being laid.
Brief:
This church built in 1870 – located in a suburban area of Copenhagen from the same period – was refurbished with new furniture, pews, baptismal font and pulpit.
Client:
Sundby Church Parochial Council
Expected completion:
2021
Parties to the construction contract:
Fangel Rådgivning
EKJ Rådg. Ing.
Aaberg Architects